Hi Experts,
I am trying to check how Capacity constraint is considered by VSR optimization using schedules in TM9.0.
The carrier schedule defines a capacity in schedule's header. The same has been defined as 1000KG. The scedule contains multile pick ups.
The optimization profile is set such that capacities 'need to be considered' and 'rough cut planning' is not to be used. (I have also tried this with 'prefer detailed planning over rough cut planning').
However, when I run optimizer, it creates tr. proposals using the schedule - 300% of capacities defined.
I understand that capacities is a hard constraint for VSR Optimizer and hence should be considered independant of any other cost => High Non-delivery costs will not make optimizer overrule the capacity constraint.
Is it something that I am missing?
Thanks in advance,
~Sudhir